Welcome [Guest!]   |   Member Sign in    |  Agency Sign in    |    Blog    |     Live Chat         
Home    |    Testimonial    |    Sitemap   |   About Travelspro    |    Contact Us           
For Assistance Call
+91 9 7070 1 8888
+91 9 0850 2 3000
Mon - Sat (10 AM - 6 PM)

Darjeeling Tour Packages > TOY TRAIN
 
 
It is quite amazing to know that the 83-km stretch between Siliguri and Darjeeling can be covered by boarding on a Toy Train in about 8 hours. The journey to the hilltop is just breathtaking and cannot be experienced anywhere else in the world in-spite of the narrow-gauge line. Construction of the railway line up to Darjeeling was completed by July 1881 and was named as Darjeeling Himalayan Railway. Darjeeling Toy Train now a 117 years old fantasy- turned out to be much a pioneering work of appreciation.

The curved railway tracks connecting Siliguri in north Bengal with Darjeeling is a prodigy of tiny rail engine with its commodious coaches. The technique of constructing the track on hilly terrain was adopted from the ways of an Australian specialist whose work assisted the engineers in avoiding the requisiteness to dig tunnels, by extending the tracks through loops.

Bookmark and Share
View Our Twitter Page View Our Facebook Page View Our Delicious Page View Our Linked In Page